Advertising
Advertising

From the rooftop deck of the Fire Station, the view looks back over the campus and toward the rolling hills across the road. To the right is one of Grimshaw's factories. It was built in a rush after the 1980s fires and because many of the parts were prefa

Photo
Originally appeared in Touring Vitra Campus, Part 2
on October 4, 2011
From the rooftop deck of the Fire Station, the view looks back over the campus and toward the rolling hills across the road. To the right is one of Grimshaw's factories. It was built in a rush after the 1980s fires and because many of the parts were prefa
From the rooftop deck of the Fire Station, the view looks back over the campus and toward the rolling hills across the road. To the right is one of Grimshaw's factories. It was built in a rush after the 1980s fires and because many of the parts were prefabricated, it was completed in just four short months.

Appears in

Advertising